Home > Products > corrugated Duct >

Post Tension Metal Duct for Prestressed Concrete Projects

Post Tension Metal Duct for Prestressed Concrete Projects
Post Tension Metal Duct for Prestressed Concrete Projects
Post Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete Projects
Categoriescorrugated Duct
AlbumView larger image
BrandChunpeng
CertificationISO9001-2008 CE
TypeMetal Building Materials
FeatureCorrosion Resistant
SizeCustomized Size
ApplicationIndustry
ShapeRound/Flat
FOB portTianjin Xingang
Terms of PaymentL/C, D/A, D/P, T/T
Download DOC
Update Time2020-04-07
Detail Information

Post Tension Metal Duct for Prestressed Concrete Projects

Post Tension Metal Duct for Prestressed Concrete Projects

Best Price Galvanized Corrugated Duct Used in Post Tension Projects

Product Overviews

Post Tension Metal Duct for Prestressed Concrete Projects

 

1. Type: Round and Flat Metal ducts;

2. Surface: Galvanized;

3. Thickness: 0.25-0.35mm

4. Dia.: 35mm-130mm;

5. Length: 2.2M/PCS,5.8M/PCS

6. Application: It's mainly used as the prestressed concrete structure, such as the large span railway and highway, bridge, crane girders, rock-soil anchoring engineering, multi-floor industrual plant, coal, sports venues. etc.

Post Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete Projects

HDPE Corrugated production and pipe detail :

 

 http://www.pcstrand.cn/contact-us.htm http://www.pcstrand.cn/contact-us.htm http://www.pcstrand.cn/contact-us.htm

Post Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete ProjectsPost Tension Metal Duct for Prestressed Concrete Projects

 Post Tension Metal Duct for Prestressed Concrete Projects

Trading Info

 MOQ

500  meters 

Grade No. Identification

English label with specifications

Transportation

in one 20' or 40'container

Trade Terms

CIF, CFR, FOB, EXW etc.

Payment

100% Irrevocable documentary L/C at sight; or 30% deposit in advance and the balance against copy B/L within 3 days

Other Payment Available

D/P at sight, Western Union, Pay Pal etc. based on the relationship of cooperation

Delivery Time

20 days after receiving the deposits or workable L/C

Shipping Time

5-30 days depend on the final destination

Bid Winning Notice

As The leader of China PC strand, Chunpeng actively replied to the invitations of China Construction Bid Institution. The followings are some of our Bid Winning Notice:

Post Tension Metal Duct for Prestressed Concrete Projects 

 

Quality Control

1) Raw material control

As the strategic partner and big customer of China's biggest steel company, Capital Steel Group, we have stable suppliers and high quality raw materials.

2) ISO9001: 2000 certificate

All of our equipments, production flow, and quality control system have passed ISO9001: 2000 certificate since 1997.

3) Strict product test

There are 260 employees in our company, including 35 experts with engineer titles. We have 3 test laboratories, 15 quality control commissioners and 11 workshops to ensure the accomplishment of the export orders. 

  

Please send your message to us
*Email
Tel
*Title
*Content

Agree to use terms of service

subscription