high-quality prestressed steel wire and steel strand Manufacturer & Supplier

Home / News / Crazy Steel /

Introduction of Concrete Pump

Introduction of Concrete Pump

Issue Time:2020-12-14
concrete pole making
Concrete pole is an important facility for power supply system. We can see it everywhere in our life. For some southeast Asia countries, Middle East countries and Africa countries, the concrete pole requirement is becoming more and more accompany with the development.

1. Prepare the necessary material such as concrete, steel bar. The steel bar shall be good quality for strong resistance;
2. To make the steel bar with correct length after it is processed to straight.
3. Put the steel bar into the concrete pole mould, and to bind the straight bar and ring bar to be a support frame,
4. Pour the concrete into the mould, then close the two parts mould as a complete part and to fix them tightly with bolts;
5. Put the mould with concrete on the centrifugal machine and rotate at a high speed, to make sure all the concrete stick on the mould wall;
6. Take if from the centrifugal machine and put it into the steam kiln to expedite concrete solidification. After this step, the concrete will be solidified at 95% percentage;
7. Take out the mould and put the concrete pole at the stock place;
For detailed information and solution, please contact us and consult our professional engineers.
pdf document download
  • ASTM A416 Chunpeng 7 wire prestressed concrete strand

    ASTM A416 Chunpeng 7 wire prestressed concrete strand

    2021-03-05
  • PE coated PC strand

    PE coated PC strand

    2021-03-05
  • pc strand

    pc strand

    2021-03-05
  • PC WIRE

    PC WIRE

    2021-03-05
Learn more from our FAQ
  • Can I visit you?

    Answer:

    Sure, If you would like to visit our factory, please contact us to make an appointment.

    More details
  • How can I know how my order is being done?

    Answer:

    We will inspect and test all items in order to avoid damage and missing parts before shipping. The detailed inspection pictures of the order will be sent to you for your confirmation before delivery.

    More details
  • Can you give warranty of your products?

    Answer:

    3.Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service. For the overseas orders, we provided emails with details including pictures or short video to you to confirm the quality before the shipment.

    More details
  • 4.How long of your delivery time?

    Answer:

    Generally need 5-10 days if it is in stock. Or need 15-20 days if it is out of stock.

    More details
Request a Quote
Fill all information details to consultwith us to get sevices from us
*Email
*Tel
*Title
*Content
Join to chunpeng to get information